Skip to main content

Controlled demo walkthrough

Use this page to run the story in the right order.

The landing page explains the product. Dashboards route operators. This page is the controlled external walkthrough that stitches those surfaces together into one professional demo path.

Use this page for

  • A founder, partner, or advisor walkthrough where the product needs a controlled sequence.
  • Showing which page to open next without improvising the story live.
  • Keeping external-facing product review inside the current proof boundary.

Do not use this page for

  • Explaining every internal dashboard in detail.
  • Replacing the landing page as product positioning copy.
  • Claiming live NHS integration, production clinical deployment, or real-world evidence readiness.
00:00

Frame the product

Use the landing page only to position Aksh Health as a review-first clinical workflow product and to state the synthetic proof boundary.

Open

Keep this short. The landing page explains category, workflow, and boundaries. It should not become the operational demo itself. For the clinical Capture→export script, prefer /demo/script.

01:00

Translate into operator views

Open dashboards to show which internal surfaces are for command, clinical review, operations, and evidence readiness.

Open

This is where the story shifts from product narrative to operational control. Show what belongs in dashboards and what does not.

02:30

Open the live work surface

Move into the command centre or workspace to show that the product is a working application, not a static pitch surface.

Open

The workflow exists behind the public pages: route state, JSON persistence, protected APIs, and operating dashboards are already live.

04:00

Show one reviewer decision

Open the clinical queue and one case so you can explain how blockers, checklist confirmation, and reviewer action flow actually work.

Open

This is the core workflow wedge: structured draft plus clinician-controlled decisioning instead of black-box output. HITL Accept is mandatory before any staging.

05:30

Show one frozen artifact + export

Open an accepted synthetic case and show finalization, SHIELD, Download FHIR Bundle, and Print/Save PDF handoff.

Open

The output is inspectable: final draft, reviewer decision, safety state, BRIDGE preliminary staging, and export quality. liveEmis:false — handoff only, not live GP write-back.

07:00

Close on evidence readiness

Show demo readiness gate, honesty banners, and the synthetic-only boundary.

Open

The next milestone is partner credentials + signed go/no-go — not premature live integration. Prefer /demo/script for the full Capture→sim→export run.